At last! Friday night again!
A few hours in my workshop and this is the result:
The two bearing housings start to look how they should look like. After cutting the flanges from a 12x12mm bar (top) and welding them to the bearing housing halfs, there was still some work to be done with the files as can be seen in the picture.
Next, the holes will be drilled, tapped and the flanges will be cut even (I left about 5 mm extra material to be cut off later).
Thanks for the pat on the back Charles!
ReplyDelete